Back in November 2020 we posted a blog regarding a temporary access walkway in Dover Marina that pontoon is still fairing well and providing mariners with access to their boats on a daily basis. And now we have a second walkway being utilised in the marina linking two of the existing moorings.
Our crew were onsite last week supplying a 33×2.5m pontoon with combisafe edge protection which has been topped with decking boards in order to keep it on the same aesthetic as the existing pontoons.
You can see how it all went together right here on our Instagram page.




