Back in February of 2018 we posted a blog folowing our involvement in bridge repairs in Kexby, North Yorkshire – https://floatingpontoonhire.co.uk/listed-bridge-repairs/ well fast forward 3.5 years and we’re back again. Thankfully nothing gone wrong, just the next phase of the repair works to ensure the bridge which has been a listed structure since 1990 is maintained and future proofed for cyclists and pedestrians – link.
Back in 2018 our pontoons were used to assist with the installation of a steel supports to the 3 arch bridge. It now requires a propping system and remedial works to ensure it remains structurally sound. The work will include piling of the western abutment; rebuilding part of the central pier; replacing the packing on the western arch; painting the steel arch frame on the western arch; and sealing of the surfacing to improve waterproofing.
All of the above work will be undertaken from our pontoons providing access for workforce as well as a platform upn which the steel bridge supports will be lowered by crane and onto the pontoon prior to being floated into place.
We’ll continue to post updates on our social media channels, click and subscribe like to stay updated. Facebook – Instagram – Twitter – LinkedIn


